Start Date & Time: 13/7/2025 00:30:00(GMT)* End Date & Time: 13/7/2025 08:30:00 (GMT)* Outage Duration: 480 Minutes
*Time Zone: Central European Time (CET) = GMT + 1 hour Central European Summer Time (CEST) = GMT + 2 hours
Justification of the work: We are required to relocate and divert our cables and network route due to the upcoming construction works being carried out by the local municipality in Wolverhampton The existing network is at risk of major faults and damage if it remains in Situ. The work schedule has been provided by the local civil authorities, and if we do not carry it out, our cables shall be permanently damaged resulting in disruption to your service. Our engineers will cut, then move the cable, and re-splice the fibres. As the cable will be cut and have to be moved, there is no back-out plan for this work.
Posted Jun 10, 2025 - 09:51 UTC
This scheduled maintenance affects: Taiga Cloud Network (Availability United Kingdom (cluster ndcloud-balder)).